Automation index
How much of a Packaging engineer’s job can AI already do?
A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Packaging engineer
27%
AI can already do 27% of this job.
#161 / 623
View rankingPackaging engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Spec, 3D and the drop test.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The packing line and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material, recyclability and unit cost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, die and pack colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Marketing, legal and not lying on the pack.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it survives the trip, and not oversizing the plastic.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design packs
- drop test
- packing line
- recyclability
- die-cut
- unit cost
- pack spec
- 3D prototype
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Cartographer
31%
#31 / 623
View rankingCartographer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sources, OSM, satellite and generalisation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Symbology, type and visual hierarchy.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Projections, scales and getting the heights right.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Review with the client, the field and the lie in the data.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Print maps, web maps and updates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Credit, metadata and owning the map.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 31% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make maps
- generalise cartography
- symbology
- choose projection
- visual hierarchy
- update OSM
- web maps
- maps that do not lie
Sources for this job· O*NET 17-1021.00· ESCO/ISCO 2165