Automation index
How much of a Packaging engineer’s job can AI already do?
A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Packaging engineer
27%
AI can already do 27% of this job.
#174 / 733
View rankingPackaging engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Spec, 3D and the drop test.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The packing line and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material, recyclability and unit cost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, die and pack colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Marketing, legal and not lying on the pack.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it survives the trip, and not oversizing the plastic.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design packs
- drop test
- packing line
- recyclability
- die-cut
- unit cost
- pack spec
- 3D prototype
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Commissioning engineer
22%
#387 / 733
View rankingCommissioning engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, the loop and the punch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, start-up and the one that is not ready.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Test, the trip and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Vendors, the one who does not come and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the deadline and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Start up, and not leaving the interlock jumped.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test protocols
- loops
- punch list
- start-up
- trips
- vendors
- interlocks
- not sign half done
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149