Automation index
How much of a Packaging engineer’s job can AI already do?
A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Packaging engineer
27%
AI can already do 27% of this job.
#161 / 623
View rankingPackaging engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Spec, 3D and the drop test.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The packing line and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material, recyclability and unit cost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, die and pack colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Marketing, legal and not lying on the pack.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it survives the trip, and not oversizing the plastic.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design packs
- drop test
- packing line
- recyclability
- die-cut
- unit cost
- pack spec
- 3D prototype
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Concrete finisher
19%
#515 / 623
View rankingConcrete finisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, joints and thickness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Pour, vibrate and float.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Screed, power float and the right moment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cure, polythene and the windy day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The late mixer and the one who wants water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not crack open, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pour concrete
- vibrate
- float
- shrinkage joints
- power float
- cure
- screed
- slab thickness
Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114