IS WORK OVER?

Automation index

How much of a Packaging engineer’s job can AI already do?

A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Packaging engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Spec, 3D and the drop test.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The packing line and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material, recyclability and unit cost.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, die and pack colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Marketing, legal and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it survives the trip, and not oversizing the plastic.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design packs
  • drop test
  • packing line
  • recyclability
  • die-cut
  • unit cost
  • pack spec
  • 3D prototype

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Control engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PID, tune and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the swing and the one that runs away.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Mode, manual and not leaving it for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Alarm, the interlock and not silencing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Operations, the recipe and not changing blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not swing, and not leaving manual for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • PID
  • tune
  • swings
  • manual mode
  • interlocks
  • recipes
  • control models
  • not silence alarms

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 172Automation engineer27%
  2. 173Cost engineer27%
  3. 174Energy engineer27%
  4. 176Reliability engineer27%
  5. 177Materials engineer27%
  6. 178Renewables engineer27%