Automation index
How much of a Packaging engineer’s job can AI already do?
A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Packaging engineer
27%
AI can already do 27% of this job.
#161 / 633
View rankingPackaging engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Spec, 3D and the drop test.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The packing line and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material, recyclability and unit cost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, die and pack colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Marketing, legal and not lying on the pack.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it survives the trip, and not oversizing the plastic.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design packs
- drop test
- packing line
- recyclability
- die-cut
- unit cost
- pack spec
- 3D prototype
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Demand planner
28%
#111 / 633
View rankingDemand planner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Forecast, promotions and bias.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Safety stock, lead time and the order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Sales, the spike and the promo nobody flagged.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
S&OP, consensus and the fight over numbers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The supplier who fails and not covering with air.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Neither empty nor drowned, and not inflating the forecast.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- demand forecast
- safety stock
- lead time
- S&OP
- promotions
- forecast bias
- supplier orders
- empty shelf
Sources for this job· O*NET 13-1081.00· ESCO/ISCO 2421