IS WORK OVER?

Automation index

How much of a Packaging engineer’s job can AI already do?

A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Packaging engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Spec, 3D and the drop test.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The packing line and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material, recyclability and unit cost.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, die and pack colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Marketing, legal and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it survives the trip, and not oversizing the plastic.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design packs
  • drop test
  • packing line
  • recyclability
  • die-cut
  • unit cost
  • pack spec
  • 3D prototype

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 173HVAC engineer27%
  2. 174Cost engineer27%
  3. 175Energy engineer27%
  4. 177Reliability engineer27%
  5. 178Lighting engineer27%
  6. 179Materials engineer27%