IS WORK OVER?

Automation index

How much of a Packaging engineer’s job can AI already do?

A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Packaging engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Spec, 3D and the drop test.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The packing line and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material, recyclability and unit cost.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, die and pack colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Marketing, legal and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it survives the trip, and not oversizing the plastic.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design packs
  • drop test
  • packing line
  • recyclability
  • die-cut
  • unit cost
  • pack spec
  • 3D prototype

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Ice-cream maker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Base, overrun and the recipe.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Churn, age and the one that crystals.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
List, season and the flavour that misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Workshop, cold and the broken chain.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Summer, the queue and not running out of vanilla.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Creamy in the mouth, and not selling ice.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • churn
  • overrun
  • age bases
  • ice-cream list
  • cold chain
  • ice crystals
  • vanilla
  • ice-cream season

Sources for this job· O*NET 51-3099.00· ESCO/ISCO 7512

Analyse my job

Jobs with similar scores

  1. 158Food engineer27%
  2. 159Automation engineer27%
  3. 160Energy engineer27%
  4. 162Materials engineer27%
  5. 163Renewables engineer27%
  6. 164Hydraulic engineer27%