Automation index
How much of a Packaging engineer’s job can AI already do?
A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Packaging engineer
27%
AI can already do 27% of this job.
#161 / 633
View rankingPackaging engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Spec, 3D and the drop test.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The packing line and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material, recyclability and unit cost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, die and pack colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Marketing, legal and not lying on the pack.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it survives the trip, and not oversizing the plastic.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design packs
- drop test
- packing line
- recyclability
- die-cut
- unit cost
- pack spec
- 3D prototype
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Inside sales
27%
#143 / 633
View rankingInside sales
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Cadence, list and the call.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Demo, objections and the one who does not answer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
CRM, the next step and not inflating the pipeline.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The SDR, the handoff and not fighting the lead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The month, the quota and not discounting extra.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Close without a visit, and that they pick up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cadences
- demos
- pipeline
- next step
- quota
- SDR
- objections
- cold calls
Sources for this job· O*NET 41-3091.00· ESCO/ISCO 2433