IS WORK OVER?

Automation index

How much of a Packaging engineer’s job can AI already do?

A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Packaging engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Spec, 3D and the drop test.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The packing line and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material, recyclability and unit cost.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, die and pack colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Marketing, legal and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it survives the trip, and not oversizing the plastic.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design packs
  • drop test
  • packing line
  • recyclability
  • die-cut
  • unit cost
  • pack spec
  • 3D prototype

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Prompt engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design prompts, tools and chains.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Evals, datasets and regressions.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Integrate with product and safety limits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to the business about a good output.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Watch hallucinations, bias and cost.
Estimate

No public source provides a precise figure. This is our estimate.

14%20%+2.8
Decide what the model gets, and what it does not.
Estimate

No public source provides a precise figure. This is our estimate.

12%16%+1.9
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design prompts, tools and chains
  • Evals, datasets and regressions
  • Integrate with product and safety limits
  • Talk to the business about a good output
  • Watch hallucinations, bias and cost
  • prompt engineer
  • ingeniero de prompts
  • llm engineer

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Analyse my job

Jobs with similar scores

  1. 158Food engineer27%
  2. 159Automation engineer27%
  3. 160Energy engineer27%
  4. 162Materials engineer27%
  5. 163Renewables engineer27%
  6. 164Hydraulic engineer27%