IS WORK OVER?

Automation index

How much of a Packaging engineer’s job can AI already do?

A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Packaging engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Spec, 3D and the drop test.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The packing line and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material, recyclability and unit cost.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, die and pack colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Marketing, legal and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it survives the trip, and not oversizing the plastic.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design packs
  • drop test
  • packing line
  • recyclability
  • die-cut
  • unit cost
  • pack spec
  • 3D prototype

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Requirements engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Workshop, the actor and the requirement.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Conflict, the loudest and not swallowing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Criterion, the test and not leaving it vague.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the impact and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The project lead, the deadline and not cutting the one that matters.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it is needed, and not the loudest one's.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • requirements
  • actor workshops
  • acceptance criteria
  • change impact
  • backlog
  • tests
  • not swallow the loudest
  • ambiguity

Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 173HVAC engineer27%
  2. 174Cost engineer27%
  3. 175Energy engineer27%
  4. 177Reliability engineer27%
  5. 178Lighting engineer27%
  6. 179Materials engineer27%