IS WORK OVER?

Automation index

How much of a Packaging engineer’s job can AI already do?

A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Packaging engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Spec, 3D and the drop test.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The packing line and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material, recyclability and unit cost.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, die and pack colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Marketing, legal and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it survives the trip, and not oversizing the plastic.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design packs
  • drop test
  • packing line
  • recyclability
  • die-cut
  • unit cost
  • pack spec
  • 3D prototype

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Stevedore

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stow plans, shifts and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Hook, guide and lash cargo.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Quay, cranes and danger zones.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Team, radio and foreman.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Dangerous goods and checks.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a container badly lashed.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Stow plans, shifts and logs
  • Hook, guide and lash cargo
  • Quay, cranes and danger zones
  • Team, radio and foreman
  • Dangerous goods and checks
  • Not leaving a container badly lashed
  • estibador
  • estiba
  • stevedore

Sources for this job· O*NET 53-7062.00· ESCO/ISCO 9333

Analyse my job

Jobs with similar scores

  1. 158Food engineer27%
  2. 159Automation engineer27%
  3. 160Energy engineer27%
  4. 162Materials engineer27%
  5. 163Renewables engineer27%
  6. 164Hydraulic engineer27%