Automation index
How much of a Packaging engineer’s job can AI already do?
A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Packaging engineer
27%
AI can already do 27% of this job.
#161 / 633
View rankingPackaging engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Spec, 3D and the drop test.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The packing line and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material, recyclability and unit cost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, die and pack colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Marketing, legal and not lying on the pack.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it survives the trip, and not oversizing the plastic.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design packs
- drop test
- packing line
- recyclability
- die-cut
- unit cost
- pack spec
- 3D prototype
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Traffic warden
21%
#405 / 633
View rankingTraffic warden
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tickets, photos and the plate record.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Junction, closure and the rush-hour jam.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Tow, parking and the one who stands in the way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Events, races and the day’s operation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Deal, explain and the insult in the street.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
A fair ticket, and not making a scene.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- issue tickets
- run junctions
- tow vehicles
- control events
- read plates
- close roads
- parking
- deal with drivers
Sources for this job· O*NET 33-3041.00· ESCO/ISCO 3355