Automation index
How much of a Packaging engineer’s job can AI already do?
A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Packaging engineer
27%
AI can already do 27% of this job.
#161 / 623
View rankingPackaging engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Spec, 3D and the drop test.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The packing line and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material, recyclability and unit cost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, die and pack colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Marketing, legal and not lying on the pack.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it survives the trip, and not oversizing the plastic.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design packs
- drop test
- packing line
- recyclability
- die-cut
- unit cost
- pack spec
- 3D prototype
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Urban planner
24%
#285 / 623
View rankingUrban planner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Draft reports, sheets and a first zoning plan.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 40% | +8.8 |
Analyse population, mobility and land data.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 35% | +6.3 |
Review objections and legal compatibility.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Tables with residents, councillors and city staff.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Field visits and reading the site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Political negotiation and defending the plan.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 8% | +1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Analyse population, mobility and land data
- Review objections and legal compatibility
- Field visits and reading the site
- urbanista
- urban planner
- planeamiento
- ordenacion del territorio
Sources for this job· O*NET 19-3051.00· ESCO/ISCO 2164