IS WORK OVER?

Automation index

How much of a Packaging engineer’s job can AI already do?

A 3D prototype comes earlier. Surviving transport and opening on the shelf do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Packaging engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Spec, 3D and the drop test.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The packing line and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material, recyclability and unit cost.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, die and pack colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Marketing, legal and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it survives the trip, and not oversizing the plastic.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design packs
  • drop test
  • packing line
  • recyclability
  • die-cut
  • unit cost
  • pack spec
  • 3D prototype

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Zoologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Census, marks and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the sign and the one that does not show.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Data, the model and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Report, the works and the corridor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The storm, the nest and not getting close.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Follow, and not disturbing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • censuses
  • signs
  • marks
  • corridors
  • nests
  • field protocols
  • population models
  • works

Sources for this job· O*NET 19-1023.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 158Food engineer27%
  2. 159Automation engineer27%
  3. 160Energy engineer27%
  4. 162Materials engineer27%
  5. 163Renewables engineer27%
  6. 164Hydraulic engineer27%