Automation index
How much of a Paediatric physiotherapist’s job can AI already do?
A motor milestone comes earlier on the sheet. The child moving and the family not giving up do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Paediatric physiotherapist
22%
AI can already do 22% of this job.
#377 / 733
View rankingPaediatric physiotherapist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assessment, milestones and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Session, the play and the one who will not.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Family, the homework and not blaming.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Orthosis, the workshop and the one that pinches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
School, the yard and not leaving them sat.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they move, and the family not giving up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- motor milestones
- paediatric physio
- therapeutic play
- children's orthoses
- the family
- school
- not blame
- sessions with children
Sources for this job· O*NET 29-1123.00· ESCO/ISCO 2264
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142