Automation index
How much of a Paid media specialist’s job can AI already do?
A media plan comes earlier. The pixel firing without burning the brand do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Paid media specialist
28%
AI can already do 28% of this job.
#123 / 623
View rankingPaid media specialist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, platforms and the pixel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Creatives, frequency and audience cuts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The client, going live and the campaign that drifts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Reports, attribution and the last-click fight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Brand safety and inventory you cannot touch.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That the pixel fires, and not burning extra CPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- media plan
- pixel
- frequency
- brand safety
- attribution
- creatives
- audiences
- digital inventory
Sources for this job· O*NET 13-1161.00· ESCO/ISCO 2431
IS WORK OVER?
Aerospace engineer
25%
#228 / 623
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144