Automation index
How much of a Paid media specialist’s job can AI already do?
A media plan comes earlier. The pixel firing without burning the brand do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Paid media specialist
28%
AI can already do 28% of this job.
#123 / 753
View rankingPaid media specialist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, platforms and the pixel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Creatives, frequency and audience cuts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The client, going live and the campaign that drifts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Reports, attribution and the last-click fight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Brand safety and inventory you cannot touch.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That the pixel fires, and not burning extra CPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- media plan
- pixel
- frequency
- brand safety
- attribution
- creatives
- audiences
- digital inventory
Sources for this job· O*NET 13-1161.00· ESCO/ISCO 2431
IS WORK OVER?
Substation technician
19%
#660 / 753
View rankingSubstation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Switching, the sheet and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bay, the earth and not going in without it.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Oil, the analysis and the one that bites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fault, the disconnector and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Control and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Open the right one, and not going in unearthed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switching
- substation sheets
- earths
- bays
- oil
- lockouts
- disconnectors
- not go in unearthed
Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113