IS WORK OVER?

Automation index

How much of a Painter and decorator’s job can AI already do?

A quote and a palette come out in a minute. Masking, sanding and leaving a room without marks is the work.

This percentage does not predict how many people will lose their jobs.

Task comparison

Painter and decorator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Quote, measure and pick colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Protect, mask and prep surfaces.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Paint, varnish and paper.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Repair texture, damp and cracks.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Dealing with neighbours, communities and hours.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Invoice, buy material and travel.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Quote, measure and pick colour
  • Protect, mask and prep surfaces
  • Paint, varnish and paper
  • Repair texture, damp and cracks
  • Invoice, buy material and travel
  • pintor de brocha
  • painter decorator

Sources for this job· O*NET 47-2141.00· ESCO/ISCO 7131

Hydrologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrograph, catchment and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, gauging and the one that does not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Flood, the alert and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Low flow, irrigation and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The authority, the figure and not dressing the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If the river rises, call it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hydrographs
  • catchments
  • gauging
  • floods
  • low flow
  • hydrology alerts
  • flows
  • the river authority

Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 603Massage therapist17%
  2. 604Leisure instructor17%
  3. 605Pastry chef17%
  4. 607Police officer17%
  5. 608Tiler17%
  6. 609Dancer16%