IS WORK OVER?

Automation index

How much of a Palaeontologist’s job can AI already do?

A 3D model comes earlier. Getting the fossil out whole without breaking it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Palaeontologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Site, grid and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Dig, consolidate and the one that breaks.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Lab, prep and the mould.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, the works and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Theft, the permit and not hiding the piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get it out whole, and not breaking it.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • sites
  • grids
  • consolidate fossils
  • prep
  • moulds
  • dig logs
  • permits
  • works on site

Sources for this job· O*NET 19-3091.00· ESCO/ISCO 2114

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 620Piling operator19%
  2. 621Recycling-plant operator19%
  3. 622Organ builder19%
  4. 624Yacht skipper19%
  5. 625Paver19%
  6. 626Pet groomer19%