IS WORK OVER?

Automation index

How much of a Palaeontologist’s job can AI already do?

A 3D model comes earlier. Getting the fossil out whole without breaking it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Palaeontologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Site, grid and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Dig, consolidate and the one that breaks.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Lab, prep and the mould.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, the works and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Theft, the permit and not hiding the piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get it out whole, and not breaking it.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • sites
  • grids
  • consolidate fossils
  • prep
  • moulds
  • dig logs
  • permits
  • works on site

Sources for this job· O*NET 19-3091.00· ESCO/ISCO 2114

Hydrogen technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
ATEX, purge and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Electrolyser, the stack and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Leak, detector and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Charge, the tube and not mixing with air.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the station and not skipping the purge.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No leak, and the protocol done.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ATEX
  • purge
  • electrolyser
  • H2 detectors
  • stacks
  • hydrogen stations
  • leaks
  • mix with air

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 531Piling operator19%
  2. 532Recycling-plant operator19%
  3. 533Organ builder19%
  4. 535Yacht skipper19%
  5. 536Paver19%
  6. 537Pet groomer19%