Automation index
How much of a Palaeontologist’s job can AI already do?
A 3D model comes earlier. Getting the fossil out whole without breaking it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Palaeontologist
19%
AI can already do 19% of this job.
#534 / 643
View rankingPalaeontologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Site, grid and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Dig, consolidate and the one that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Lab, prep and the mould.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, the works and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Theft, the permit and not hiding the piece.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Get it out whole, and not breaking it.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- sites
- grids
- consolidate fossils
- prep
- moulds
- dig logs
- permits
- works on site
Sources for this job· O*NET 19-3091.00· ESCO/ISCO 2114
IS WORK OVER?
Tower crane operator
18%
#583 / 643
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343