IS WORK OVER?

Automation index

How much of a Panel beater’s job can AI already do?

A quote and a part come earlier. Pulling a wing so it does not show does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Panel beater

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Assess, order parts and quote.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pull, weld and set gaps.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Fill, sand and prep for paint.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Client, insurer and deadlines.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Shop, benches and tools.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Not delivering a car that looks bent.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Assess, order parts and quote
  • Pull, weld and set gaps
  • Fill, sand and prep for paint
  • Client, insurer and deadlines
  • Shop, benches and tools
  • Not delivering a car that looks bent
  • chapista
  • panel beater
  • chapa y pintura

Sources for this job· O*NET 49-3021.00· ESCO/ISCO 7213

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 556Camera operator18%
  2. 557Bartender18%
  3. 558Postal worker18%
  4. 560Cardiac surgeon18%
  5. 561Ambulance driver18%
  6. 562Choreographer18%