Automation index
How much of a Paramedic’s job can AI already do?
Paramedics treat emergencies outside hospital and move the patient.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Paramedic
14%
AI can already do 14% of this job.
#740 / 743
View rankingParamedic
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Notes and protocolsEstimateNo public source provides a precise figure. This is our estimate. | 20% | 30% | +6 |
Street care and transferEstimateNo public source provides a precise figure. This is our estimate. | 50% | 8% | +4 |
Life-threatening callsEstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
CoordinationEstimateNo public source provides a precise figure. This is our estimate. | 10% | 15% | +1.5 |
| Total | 100% | 14% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hygiene in a health care setting
- behavioural science
- pharmacology
- disorders of vital functions
- sanitary technology
- transportation methods
- pathogenic microorganisms
- sociology applied to paramedical science
- health care system
- human anatomy
Sources for this job· O*NET 29-2042.00· ESCO/ISCO 3258
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142