Automation index
Can AI do the work of a Paramedic?
Paramedics treat emergencies outside hospital and move the patient.
It also does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Paramedic
14%
AI or a robot can already do 14% of this job.
#101 / 103
View rankingParamedic
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Notes and protocolsEstimateNo public source pins this saving. It is an estimate of the method. | 20% | 30% | +6 |
Street care and transferEstimateNo public source pins this saving. It is an estimate of the method. | 50% | 8% | +4 |
Life-threatening callsEstimateNo public source pins this saving. It is an estimate of the method. | 20% | 12% | +2.4 |
CoordinationEstimateNo public source pins this saving. It is an estimate of the method. | 10% | 15% | +1.5 |
| Total | 100% | 14% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- hygiene in a health care setting
- behavioural science
- pharmacology
- disorders of vital functions
- sanitary technology
- transportation methods
- pathogenic microorganisms
- sociology applied to paramedical science
- health care system
- human anatomy
Sources for this job· O*NET 29-2042.00· ESCO/ISCO 3258
IS WORK OVER?
Database administrator
28%
#48 / 103
View rankingDatabase administrator
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Tuning, indexes and execution plans.EstimateNo public source pins this saving. It is an estimate of the method. | 22% | 48% | +10.6 |
Backups, jobs and docs.EstimateNo public source pins this saving. It is an estimate of the method. | 18% | 42% | +7.6 |
Incidents, locks and restores.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 20% | +3.2 |
Schema changes with development.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 15% | +2.4 |
Permissions, audit and PII.EstimateNo public source pins this saving. It is an estimate of the method. | 14% | 18% | +2.5 |
Capacity, cost and engine choice.EstimateNo public source pins this saving. It is an estimate of the method. | 14% | 16% | +2.2 |
| Total | 100% | 28% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- Tuning, indexes and execution plans
- Backups, jobs and docs
- Incidents, locks and restores
- Schema changes with development
- Permissions, audit and PII
- Capacity, cost and engine choice
- dba
- administrador de base de datos
- oracle dba
Sources for this job· O*NET 15-1242.00· ESCO/ISCO 2521