Automation index
How much of a Paramedic’s job can AI already do?
Paramedics treat emergencies outside hospital and move the patient.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Paramedic
14%
AI can already do 14% of this job.
#760 / 763
View rankingParamedic
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Notes and protocolsEstimateNo public source provides a precise figure. This is our estimate. | 20% | 30% | +6 |
Street care and transferEstimateNo public source provides a precise figure. This is our estimate. | 50% | 8% | +4 |
Life-threatening callsEstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
CoordinationEstimateNo public source provides a precise figure. This is our estimate. | 10% | 15% | +1.5 |
| Total | 100% | 14% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hygiene in a health care setting
- behavioural science
- pharmacology
- disorders of vital functions
- sanitary technology
- transportation methods
- pathogenic microorganisms
- sociology applied to paramedical science
- health care system
- human anatomy
Sources for this job· O*NET 29-2042.00· ESCO/ISCO 3258
IS WORK OVER?
Gas network engineer
22%
#406 / 763
View rankingGas network engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, pressures and the diameter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Trench, the weld and the one that was not x-rayed.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Leak, the detector and getting people out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cut, the bypass and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the rush and not covering without testing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the trench does not go up, and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- network pressures
- diameters
- trenches
- gas welds
- leaks
- detectors
- bypass
- x-rays
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145