Automation index
How much of a Parking attendant’s job can AI already do?
A barrier comes earlier. Running the car park without wrecking the person who lost the ticket do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Parking attendant
24%
AI can already do 24% of this job.
#260 / 633
View rankingParking attendant
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Barriers, tickets and the count.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The one who cannot find the car and the one who will not pay.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Incidents, the down barrier and the jam.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shift, cash and cashing up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
The event, the full house and not blocking the street.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Run the car park, and not wrecking the lost-ticket person.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- barriers
- parking tickets
- space count
- cashing up
- stuck barrier
- events
- lost cars
- exit jam
Sources for this job· O*NET 33-9091.00· ESCO/ISCO 5414
IS WORK OVER?
Aerospace engineer
25%
#228 / 633
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144