Automation index
How much of a Pastry chef’s job can AI already do?
Costing and a cake design come earlier. Tempering chocolate and stacking a millefeuille that does not collapse do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Pastry chef
17%
AI can already do 17% of this job.
#605 / 643
View rankingPastry chef
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design menus, cost and cake orders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Doughs, creams and chocolate.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Assemble, decorate and finish.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Counter, orders and client care.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Hygiene, cold chain and storage.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Train assistants and shop-floor pace.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cook
- mise en place
- dishes
- bake
- Design menus, cost and cake orders
- Doughs, creams and chocolate
- Assemble, decorate and finish
- Counter, orders and client care
- Hygiene, cold chain and storage
- Train assistants and shop-floor pace
Sources for this job· O*NET 51-3011.00· ESCO/ISCO 7512
IS WORK OVER?
CNC machinist
24%
#280 / 643
View rankingCNC machinist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, simulate and document the cycle.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Work orders, paper metrology and batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set up, set zeros and start.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 14% | +2.8 |
Measure, adjust and not break a tool.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Maintenance, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Talk to engineering when the drawing lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Program, simulate and document the cycle
- Work orders, paper metrology and batches
- Set up, set zeros and start
- Measure, adjust and not break a tool
- Maintenance, swarf and safety
- Talk to engineering when the drawing lies
- cnc
- operario cnc
- fresador
- tornero cnc
Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223