Automation index
How much of a Pathologist’s job can AI already do?
A first slice and a code come earlier. Putting the diagnosis the chemo depends on do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Pathologist
30%
AI can already do 30% of this job.
#44 / 733
View rankingPathologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Grossing, embedding and the first trim.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Read stains, IHC and a template report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 52% | +8.3 |
The hard case, the second look and the frozen section.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Board, the surgeon on the phone and the margin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cytology, autopsy and the specimen that arrives late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Signing the diagnosis and what the patient is playing for.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 30% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- read biopsies
- grossing
- immunohistochemistry
- frozen section
- pathology report
- cytology
- surgical margins
- autopsy
Sources for this job· O*NET 29-1222.00· ESCO/ISCO 2212
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142