Automation index
How much of a Pathologist’s job can AI already do?
A first slice and a code come earlier. Putting the diagnosis the chemo depends on do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Pathologist
30%
AI can already do 30% of this job.
#44 / 733
View rankingPathologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Grossing, embedding and the first trim.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Read stains, IHC and a template report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 52% | +8.3 |
The hard case, the second look and the frozen section.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Board, the surgeon on the phone and the margin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cytology, autopsy and the specimen that arrives late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Signing the diagnosis and what the patient is playing for.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 30% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- read biopsies
- grossing
- immunohistochemistry
- frozen section
- pathology report
- cytology
- surgical margins
- autopsy
Sources for this job· O*NET 29-1222.00· ESCO/ISCO 2212
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142