IS WORK OVER?

Automation index

How much of a Paver’s job can AI already do?

A fall set-out comes earlier. Leaving a pavement that does not pond do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Paver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, levels and layer thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Lay, compact and the edge that opens.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Joints, seals and the gully junction.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Plant, mix temperature and the cold day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving a step.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No ponding, and not skimping compaction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • lay asphalt
  • compact
  • falls
  • pavement joints
  • gullies
  • mix temperature
  • pavement levels
  • seals

Sources for this job· O*NET 47-2071.00· ESCO/ISCO 7112

Electronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, simulation and PCB layout.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Firmware, tests and bench.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Vendors, prototypes and certifications.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Debug EMC and field faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versioning and quality.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not sending a blind board to manufacture.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Schematic, simulation and PCB layout
  • Firmware, tests and bench
  • Vendors, prototypes and certifications
  • Debug EMC and field faults
  • Documentation, versioning and quality
  • Not sending a blind board to manufacture
  • ingeniero electronico
  • electronics engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152

Analyse my job

Jobs with similar scores

  1. 523Organ builder19%
  2. 524Palaeontologist19%
  3. 525Yacht skipper19%
  4. 527Pet groomer19%
  5. 528Airline pilot19%
  6. 529TV presenter19%