IS WORK OVER?

Automation index

How much of a Paver’s job can AI already do?

A fall set-out comes earlier. Leaving a pavement that does not pond do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Paver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, levels and layer thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Lay, compact and the edge that opens.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Joints, seals and the gully junction.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Plant, mix temperature and the cold day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving a step.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No ponding, and not skimping compaction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • lay asphalt
  • compact
  • falls
  • pavement joints
  • gullies
  • mix temperature
  • pavement levels
  • seals

Sources for this job· O*NET 47-2071.00· ESCO/ISCO 7112

Hydrogen technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
ATEX, purge and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Electrolyser, the stack and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Leak, detector and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Charge, the tube and not mixing with air.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the station and not skipping the purge.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No leak, and the protocol done.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ATEX
  • purge
  • electrolyser
  • H2 detectors
  • stacks
  • hydrogen stations
  • leaks
  • mix with air

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 533Organ builder19%
  2. 534Palaeontologist19%
  3. 535Yacht skipper19%
  4. 537Pet groomer19%
  5. 538Airline pilot19%
  6. 539TV presenter19%