IS WORK OVER?

Automation index

How much of a Paver’s job can AI already do?

A fall set-out comes earlier. Leaving a pavement that does not pond do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Paver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, levels and layer thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Lay, compact and the edge that opens.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Joints, seals and the gully junction.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Plant, mix temperature and the cold day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving a step.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No ponding, and not skimping compaction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • lay asphalt
  • compact
  • falls
  • pavement joints
  • gullies
  • mix temperature
  • pavement levels
  • seals

Sources for this job· O*NET 47-2071.00· ESCO/ISCO 7112

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 523Organ builder19%
  2. 524Palaeontologist19%
  3. 525Yacht skipper19%
  4. 527Pet groomer19%
  5. 528Airline pilot19%
  6. 529TV presenter19%