IS WORK OVER?

Automation index

How much of a Paver’s job can AI already do?

A fall set-out comes earlier. Leaving a pavement that does not pond do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Paver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, levels and layer thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Lay, compact and the edge that opens.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Joints, seals and the gully junction.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Plant, mix temperature and the cold day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving a step.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No ponding, and not skimping compaction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • lay asphalt
  • compact
  • falls
  • pavement joints
  • gullies
  • mix temperature
  • pavement levels
  • seals

Sources for this job· O*NET 47-2071.00· ESCO/ISCO 7112

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 640Organ builder19%
  2. 641Palaeontologist19%
  3. 642Yacht skipper19%
  4. 644Pet groomer19%
  5. 645Airline pilot19%
  6. 646Local police officer19%