IS WORK OVER?

Automation index

How much of a PCB technician’s job can AI already do?

A gerber comes earlier. The board coming out without an open track do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

PCB technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Gerber, stack-up and the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Etch, drill and the one that drifts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
AOI, the bridge and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Assemble, the oven and the one that warps.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not skipping AOI.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The board comes out, and the track whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • gerber
  • stack-up
  • AOI
  • drill
  • tracks
  • solder oven
  • bridges
  • PCB batches

Sources for this job· O*NET 51-2022.00· ESCO/ISCO 3113

Bus driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Run sheet, logs and clocking.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive the route or the charter.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Stops, accessibility and fare or validation.
Estimate

No public source provides a precise figure. This is our estimate.

18%10%+1.8
Incidents, diversions and passenger care.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Pre-trip check and defect reports.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Shifts, fatigue and driving rules.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive
  • route
  • load goods
  • Run sheet, logs and clocking
  • Drive the route or the charter
  • Incidents, diversions and passenger care
  • Pre-trip check and defect reports
  • Shifts, fatigue and driving rules
  • conductor de autobus
  • bus driver

Sources for this job· O*NET 53-3052.00· ESCO/ISCO 8331

Analyse my job

Jobs with similar scores

  1. 381Water technician22%
  2. 382Avionics technician22%
  3. 383Calibration technician22%
  4. 385Appliance technician22%
  5. 386NDT technician22%
  6. 387Pharmacy technician22%