Automation index
How much of a PCB technician’s job can AI already do?
A gerber comes earlier. The board coming out without an open track do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
PCB technician
22%
AI can already do 22% of this job.
#455 / 733
View rankingPCB technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Gerber, stack-up and the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Etch, drill and the one that drifts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
AOI, the bridge and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Assemble, the oven and the one that warps.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the deadline and not skipping AOI.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The board comes out, and the track whole.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- gerber
- stack-up
- AOI
- drill
- tracks
- solder oven
- bridges
- PCB batches
Sources for this job· O*NET 51-2022.00· ESCO/ISCO 3113
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142