IS WORK OVER?

Automation index

How much of a PCB technician’s job can AI already do?

A gerber comes earlier. The board coming out without an open track do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

PCB technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Gerber, stack-up and the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Etch, drill and the one that drifts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
AOI, the bridge and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Assemble, the oven and the one that warps.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not skipping AOI.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The board comes out, and the track whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • gerber
  • stack-up
  • AOI
  • drill
  • tracks
  • solder oven
  • bridges
  • PCB batches

Sources for this job· O*NET 51-2022.00· ESCO/ISCO 3113

Metro driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checks, tests and the cab log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, stop at platforms and regulate running.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Incidents, evacuation and talk to Control.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Timetables, reliefs and the day’s orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Passengers, platforms and announcements.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Rules, fatigue and liability for the train.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive metro trains
  • stop at platforms
  • regulate running
  • evacuate tunnels
  • talk to control
  • cab checks
  • handle incidents
  • drive under ATO

Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311

Analyse my job

Jobs with similar scores

  1. 390Water technician22%
  2. 391Avionics technician22%
  3. 392Calibration technician22%
  4. 394Appliance technician22%
  5. 395NDT technician22%
  6. 396Pharmacy technician22%