IS WORK OVER?

Automation index

How much of a PCB technician’s job can AI already do?

A gerber comes earlier. The board coming out without an open track do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

PCB technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Gerber, stack-up and the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Etch, drill and the one that drifts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
AOI, the bridge and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Assemble, the oven and the one that warps.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not skipping AOI.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The board comes out, and the track whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • gerber
  • stack-up
  • AOI
  • drill
  • tracks
  • solder oven
  • bridges
  • PCB batches

Sources for this job· O*NET 51-2022.00· ESCO/ISCO 3113

Mixer-truck driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Order, mix and mixing time.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Drive, site and the tight access.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Pour, pump and the one who wants more water.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Wash, leftovers and not leaving a hard drum.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The jam, the delay and the concrete that sets.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Arrive fresh, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive mixers
  • batch
  • pour concrete
  • wash the drum
  • slump
  • concrete pump
  • mix order
  • site access

Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332

Analyse my job

Jobs with similar scores

  1. 390Water technician22%
  2. 391Avionics technician22%
  3. 392Calibration technician22%
  4. 394Appliance technician22%
  5. 395NDT technician22%
  6. 396Pharmacy technician22%