IS WORK OVER?

Automation index

How much of a PCB technician’s job can AI already do?

A gerber comes earlier. The board coming out without an open track do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

PCB technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Gerber, stack-up and the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Etch, drill and the one that drifts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
AOI, the bridge and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Assemble, the oven and the one that warps.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not skipping AOI.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The board comes out, and the track whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • gerber
  • stack-up
  • AOI
  • drill
  • tracks
  • solder oven
  • bridges
  • PCB batches

Sources for this job· O*NET 51-2022.00· ESCO/ISCO 3113

Shipbuilder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Block, alignment and the yard.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bead, NDT and the one that failed.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Launch, the weight and not jumping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Sea trial, the vibration and the one that knocks.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The owner, the rush and not leaving the bead half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it floats true, and not leaving the bead.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • yard blocks
  • alignment
  • ship beads
  • launch
  • sea trials
  • marine NDT
  • owners
  • vibrations

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 467Water technician22%
  2. 468Avionics technician22%
  3. 469Calibration technician22%
  4. 471Dietetic technician22%
  5. 472Appliance technician22%
  6. 473NDT technician22%