Automation index
How much of a PCB technician’s job can AI already do?
A gerber comes earlier. The board coming out without an open track do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
PCB technician
22%
AI can already do 22% of this job.
#397 / 653
View rankingPCB technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Gerber, stack-up and the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Etch, drill and the one that drifts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
AOI, the bridge and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Assemble, the oven and the one that warps.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the deadline and not skipping AOI.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The board comes out, and the track whole.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- gerber
- stack-up
- AOI
- drill
- tracks
- solder oven
- bridges
- PCB batches
Sources for this job· O*NET 51-2022.00· ESCO/ISCO 3113
IS WORK OVER?
Sterile processing technician
19%
#557 / 653
View rankingSterile processing technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Intake, the dirty and the count.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Wash, the ultrasonic and what is left.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Pack, the indicator and the set.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Autoclave, the load and the cycle that fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Theatre, the rush and not sending a wet set.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Truly sterile, and not mixing the dirty.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- autoclave
- surgical sets
- biological indicators
- ultrasonic wash
- sterile pack
- instrument count
- steam cycles
- not mix dirty
Sources for this job· O*NET 31-9093.00· ESCO/ISCO 3213