Automation index
How much of a PCB technician’s job can AI already do?
A gerber comes earlier. The board coming out without an open track do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
PCB technician
22%
AI can already do 22% of this job.
#384 / 633
View rankingPCB technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Gerber, stack-up and the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Etch, drill and the one that drifts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
AOI, the bridge and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Assemble, the oven and the one that warps.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the deadline and not skipping AOI.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The board comes out, and the track whole.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- gerber
- stack-up
- AOI
- drill
- tracks
- solder oven
- bridges
- PCB batches
Sources for this job· O*NET 51-2022.00· ESCO/ISCO 3113
IS WORK OVER?
Tower crane operator
18%
#573 / 633
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343