Automation index
How much of a PE teacher’s job can AI already do?
A stock session comes earlier. Getting them actually moving without getting hurt do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
PE teacher
22%
AI can already do 22% of this job.
#367 / 633
View rankingPE teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Session, aims and the kit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Yard, the group and the one who will not.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Injury, protocol and calling home.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Assess, the report and not giving a 10 for quiet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Staff, the rain and not leaving them in the corridor.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they move, and not getting hurt.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- PE sessions
- the yard
- injury protocol
- assess PE
- sports kit
- staff meeting
- groups
- the report
Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330
IS WORK OVER?
Chemical engineer
25%
#241 / 633
View rankingChemical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Balances, simulation and sizing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
P&IDs, specs and equipment lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Plant, operators and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Safety, HAZOP and discharges.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Quality, standards and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a process that will not explode.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Balances, simulation and sizing
- P&IDs, specs and equipment lists
- Plant, operators and commissioning
- Safety, HAZOP and discharges
- Quality, standards and documentation
- Sign a process that will not explode
- ingeniero quimico
- chemical engineer
Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145