IS WORK OVER?

Automation index

How much of a PE teacher’s job can AI already do?

A stock session comes earlier. Getting them actually moving without getting hurt do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

PE teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Session, aims and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Yard, the group and the one who will not.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Injury, protocol and calling home.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Assess, the report and not giving a 10 for quiet.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Staff, the rain and not leaving them in the corridor.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they move, and not getting hurt.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • PE sessions
  • the yard
  • injury protocol
  • assess PE
  • sports kit
  • staff meeting
  • groups
  • the report

Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 364Order picker22%
  2. 365Strength and conditioning coach22%
  3. 366Adult-education teacher22%
  4. 368Vocational teacher22%
  5. 369Golf professional22%
  6. 370Music teacher22%