IS WORK OVER?

Automation index

Can AI do the work of a Pediatrician?

Pediatricians look after children and teenagers, from clinic to minor emergencies.

It also does not predict how many people will lose their jobs.

Task comparison

Pediatrician

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Prescribe or administer treatment, therapy, medication, vaccination, and other specialized medical care to treat or prevent illness, disease, or injury in infants and children.
Estimate

No public source pins this saving. It is an estimate of the method.

11%28%+3.1
Treat children who have minor illnesses, acute and chronic health problems, and growth and development concerns.
Estimate

No public source pins this saving. It is an estimate of the method.

11%28%+3.1
Examine children regularly to assess their growth and development.
Estimate

No public source pins this saving. It is an estimate of the method.

11%28%+3.1
Collect, record, and maintain patient information, such as medical history, reports, or examination results.
Estimate

No public source pins this saving. It is an estimate of the method.

11%12%+1.3
Advise patients, parents or guardians, and community members concerning diet, activity, hygiene, and disease prevention.
Estimate

No public source pins this saving. It is an estimate of the method.

10%12%+1.2
Examine patients or order, perform, and interpret diagnostic tests to obtain information on medical condition and determine diagnosis.
Estimate

No public source pins this saving. It is an estimate of the method.

9%12%+1.1
Explain procedures and discuss test results or prescribed treatments with patients and parents or guardians.
Estimate

No public source pins this saving. It is an estimate of the method.

9%12%+1.1
Monitor patients' conditions and progress and reevaluate treatments as necessary.
Estimate

No public source pins this saving. It is an estimate of the method.

7%12%+0.8
Other less frequent tasks (weight estimated from frequency).
Estimate

No public source pins this saving. It is an estimate of the method.

21%28%+5.9
Total100%21%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • manage research data
  • operate open source software
  • demonstrate disciplinary expertise
  • think abstractly
  • manage personal professional development
  • synthesise information
  • develop own practices continuously

Sources for this job· O*NET 29-1221.00· ESCO/ISCO 2211

Video editor

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Select and combine the most effective shots of each scene to form a logical and smoothly running story.
Estimate

No public source pins this saving. It is an estimate of the method.

7%28%+2
Edit films and videotapes to insert music, dialogue, and sound effects, to arrange films into sequences, and to correct errors, using editing equipment.
Estimate

No public source pins this saving. It is an estimate of the method.

7%28%+2
Set up and operate computer editing systems, electronic titling systems, video switching equipment, and digital video effects units to produce a final product.
Estimate

No public source pins this saving. It is an estimate of the method.

7%28%+2
Organize and string together raw footage into a continuous whole according to scripts or the instructions of directors and producers.
Estimate

No public source pins this saving. It is an estimate of the method.

7%28%+2
Review footage sequence by sequence to become familiar with it before assembling it into a final product.
Estimate

No public source pins this saving. It is an estimate of the method.

6%28%+1.7
Mark frames where a particular shot or piece of sound is to begin or end.
Estimate

No public source pins this saving. It is an estimate of the method.

6%28%+1.7
Verify key numbers and time codes on materials.
Estimate

No public source pins this saving. It is an estimate of the method.

6%28%+1.7
Cut shot sequences to different angles at specific points in scenes, making each individual cut as fluid and seamless as possible.
Estimate

No public source pins this saving. It is an estimate of the method.

6%28%+1.7
Other less frequent tasks (weight estimated from frequency).
Estimate

No public source pins this saving. It is an estimate of the method.

48%28%+13.4
Total100%28%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • personal directing styles
  • film production process
  • graphic design
  • motion graphics
  • ICT software specifications
  • multimedia systems
  • follow work schedule
  • consult with producer
  • watch scenes
  • put uncut recordings into computer

Sources for this job· O*NET 27-4032.00· ESCO/ISCO 2654

Analyse my job

Nearby in the ranking

  1. 86Nursing assistant23%
  2. 87Doctor22%
  3. 88Physiotherapist21%
  4. 90Dietitian20%
  5. 91Executive chef19%
  6. 92Judge19%