IS WORK OVER?

Automation index

How much of a Perfusionist’s job can AI already do?

A bypass protocol comes earlier. Running the pump and giving the patient back whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Perfusionist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Build the circuit, prime and the checklist.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Run the pump, gases and temperature.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Cardioplegia, haemofiltration and weaning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
ECMO, emergencies and the oxygenator change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Logs, alarms and talk to the surgeon.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
No air in the line and owning the machine.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run the pump
  • CPB
  • prime the circuit
  • cardioplegia
  • ECMO
  • wean off pump
  • oxygenator
  • perfusion

Sources for this job· O*NET 29-2099.00· ESCO/ISCO 3212

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 459Neonatologist20%
  2. 460Osteopath20%
  3. 461Skipper20%
  4. 463Pizza maker20%
  5. 464Politician20%
  6. 465Harbour pilot20%