Automation index
How much of a Perfusionist’s job can AI already do?
A bypass protocol comes earlier. Running the pump and giving the patient back whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Perfusionist
20%
AI can already do 20% of this job.
#577 / 773
View rankingPerfusionist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Build the circuit, prime and the checklist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Run the pump, gases and temperature.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Cardioplegia, haemofiltration and weaning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
ECMO, emergencies and the oxygenator change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logs, alarms and talk to the surgeon.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
No air in the line and owning the machine.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run the pump
- CPB
- prime the circuit
- cardioplegia
- ECMO
- wean off pump
- oxygenator
- perfusion
Sources for this job· O*NET 29-2099.00· ESCO/ISCO 3212
IS WORK OVER?
Firmware engineer
22%
#409 / 773
View rankingFirmware engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Image, the signature and the slot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Flash, the batch and the one that bricks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rollback, the test and not skipping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Boot, the brick and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The factory, the cadence and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Flash without bricking, and not skipping rollback.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- firmware images
- digital signature
- slots
- flash
- rollback
- boot
- factory batches
- not brick
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514