Automation index
How much of a Perfusionist’s job can AI already do?
A bypass protocol comes earlier. Running the pump and giving the patient back whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Perfusionist
20%
AI can already do 20% of this job.
#550 / 743
View rankingPerfusionist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Build the circuit, prime and the checklist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Run the pump, gases and temperature.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Cardioplegia, haemofiltration and weaning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
ECMO, emergencies and the oxygenator change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logs, alarms and talk to the surgeon.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
No air in the line and owning the machine.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run the pump
- CPB
- prime the circuit
- cardioplegia
- ECMO
- wean off pump
- oxygenator
- perfusion
Sources for this job· O*NET 29-2099.00· ESCO/ISCO 3212
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142