Automation index
How much of a Perfusionist’s job can AI already do?
A bypass protocol comes earlier. Running the pump and giving the patient back whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Perfusionist
20%
AI can already do 20% of this job.
#550 / 743
View rankingPerfusionist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Build the circuit, prime and the checklist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Run the pump, gases and temperature.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Cardioplegia, haemofiltration and weaning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
ECMO, emergencies and the oxygenator change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logs, alarms and talk to the surgeon.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
No air in the line and owning the machine.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run the pump
- CPB
- prime the circuit
- cardioplegia
- ECMO
- wean off pump
- oxygenator
- perfusion
Sources for this job· O*NET 29-2099.00· ESCO/ISCO 3212
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142