Automation index
How much of a Perfusionist’s job can AI already do?
A bypass protocol comes earlier. Running the pump and giving the patient back whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Perfusionist
20%
AI can already do 20% of this job.
#462 / 633
View rankingPerfusionist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Build the circuit, prime and the checklist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Run the pump, gases and temperature.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Cardioplegia, haemofiltration and weaning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
ECMO, emergencies and the oxygenator change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logs, alarms and talk to the surgeon.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
No air in the line and owning the machine.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run the pump
- CPB
- prime the circuit
- cardioplegia
- ECMO
- wean off pump
- oxygenator
- perfusion
Sources for this job· O*NET 29-2099.00· ESCO/ISCO 3212
IS WORK OVER?
Telecom engineer
25%
#235 / 633
View rankingTelecom engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Size, simulate and plan radio and fibre.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Projects, permits and sites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Field, measurements and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Incidents, NOC and operators.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, spectrum and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a town dark from a mistake.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Size, simulate and plan radio and fibre
- Projects, permits and sites
- Field, measurements and commissioning
- Incidents, NOC and operators
- Rules, spectrum and documentation
- Not leaving a town dark from a mistake
- ingeniero de telecomunicaciones
- telecom engineer
Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153