Automation index
How much of a Pest control technician’s job can AI already do?
A protocol and a sheet come earlier. Treating without poisoning the people who live there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Pest control technician
25%
AI can already do 25% of this job.
#254 / 633
View rankingPest control technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, species and the treatment plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bait, apply, seal and look again.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Sheets, schedule and the certificate for the client.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Explain risks, times and what is not a miracle.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Rules, biocides and waste.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
That the pest drops and nobody else pays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pest control
- inspect infestations
- bait
- apply biocides
- seal entry points
- treatment certificate
- identify species
- not poison anyone
Sources for this job· O*NET 37-2021.00· ESCO/ISCO 7544
IS WORK OVER?
Robotics engineer
25%
#234 / 633
View rankingRobotics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paths, PLC and the cell twin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Cell, grippers and the cycle that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Safety, fencing and CE validation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, backups and the overwritten program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Production, takt and the robot that stops.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it takes nobody with it, and signing the cell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program robots
- paths
- robot cells
- safety fencing
- cell PLC
- CE validation
- grippers
- takt
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149