Automation index
How much of a Pest control technician’s job can AI already do?
A protocol and a sheet come earlier. Treating without poisoning the people who live there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Pest control technician
25%
AI can already do 25% of this job.
#259 / 643
View rankingPest control technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, species and the treatment plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bait, apply, seal and look again.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Sheets, schedule and the certificate for the client.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Explain risks, times and what is not a miracle.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Rules, biocides and waste.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
That the pest drops and nobody else pays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pest control
- inspect infestations
- bait
- apply biocides
- seal entry points
- treatment certificate
- identify species
- not poison anyone
Sources for this job· O*NET 37-2021.00· ESCO/ISCO 7544
IS WORK OVER?
Wind-turbine technician
19%
#546 / 643
View rankingWind-turbine technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SCADA, the code and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, the wind and the one who is sick.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Nacelle, the oil and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rescue, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the access and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and the turbine running.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm SCADA
- climb the tower
- nacelle
- height rescue
- oils
- fault codes
- access
- wind
Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412